Generators
20 kW – 4 MW · Diesel · Gas · Bi-fuel
- Standby & prime power gensets
- Paralleling switchgear & ATS
- Sound-attenuated enclosures
- Sub-base & belly fuel tanks
- Load bank testing & commissioning
SPM engineers, supplies and services generators, transformers, air handling and cooling (HVAC) systems for data centers, hospitals, utilities and heavy industry — with lead times measured in weeks, not quarters.
From standby gensets to substation transformers, precision cooling and the steel structures that house them — one supplier, one project manager, one warranty.
20 kW – 4 MW · Diesel · Gas · Bi-fuel
15 kVA – 50 MVA · Pad · Pole · Substation
5 – 1,500 tons · Chillers · Air handlers · CRAH
Clear-span · PEMB · Structural steel
One partner for the whole build. We engineer, fabricate, procure and commission the structure, power and cooling as a single turnkey scope — so there's one team accountable from foundation to first load.
In-house PEs run load, short-circuit and coordination studies so the spec lands right the first time.
Steel shells built to spec, direct OEM allocations, three staging yards and nationwide dispatch.
Erected, wired, load-bank tested and turned over ready to run — on weeks-not-quarters timelines.
Traditional power generation throws away most of its fuel as waste heat. Our trigeneration system captures it — a solid-oxide fuel cell generates electricity at 60% efficiency, then its 500°C exhaust drives a lithium-bromide absorption chiller for cooling instead of being vented to atmosphere.
Converts natural gas or hydrogen straight to electricity — well above what combustion can reach.
Exhaust that's normally vented to atmosphere is routed through a recovery heat exchanger.
Runs a refrigeration cycle on recovered heat, not electricity — silent, with few moving parts.
From sub-zero rooftop chiller plants to 5 GW campuses — our power and thermal systems are specified, staged and commissioned to run without interruption, in the conditions that break lesser equipment.
SPM turned what should have been a 9-month transformer lead-time into 14 weeks, and had crews on site the day it landed. They're the only supplier we trust for fast-track work now.
SPM engineers, supplies and services generators, transformers, data center power, air handling and cooling (HVAC and chillers). We handle everything from 20 kW standby generators to 50 MVA transformers and 1,500-ton chiller plants.
Yes. SPM designs and delivers complete data center power and cooling — generators, UPS, transformers, switchgear, chillers, CRAH units and air handling — in N+1 to 2N redundant configurations from edge cabinets up to gigawatt-scale campuses.
SPM supplies air- and water-cooled chillers, rooftop units, air handling units (AHUs), CRAH units, VRF/VRV systems and precision cooling for data halls — from 5 to 1,500 tons, with BACnet/Modbus controls integration.
Generators range from 20 kW to 4 MW in diesel, gas and bi-fuel, with paralleling switchgear and ATS. Transformers range from 15 kVA to 50 MVA — pad, pole and station-class, dry-type and liquid-filled.
SPM is headquartered in California, USA and delivers generators, transformers, air handling and cooling equipment across 42 states — with lead times measured in weeks, not quarters.
Real engineers, not a form-routing bot. Send us a one-line, a single-line diagram, or a full spec package — we'll come back with sizing, pricing and lead time.